
How a Concrete Job Goes
Updated
Six steps from the first message to a slab that can take a Rockford winter. The written price comes before anything else.
Get a free quote
A concrete contractor replies with a price. Nothing is booked until you say yes.
Rather talk? Call (815) 420-3970 or text us.
1. Tell us what you want poured
The form asks for the town, the job and a rough size. Say whether old concrete has to come out, whether a truck can reach the spot, and what the slab will carry (a car, a camper, a shed). A phone photo of the area saves a trip.
2. Get a written price
A concrete contractor replies with what the job should cost and when it can be poured. Illinois law wants a signed written contract for home repair work over $1,000, so ask for one. Nothing is booked until you agree.
3. Permits and utility locates
Rockford wants a $79 permit for a 1 or 2 family driveway, curb cut, sidewalk or approach, doubled if work starts first. Footings and structures over 120 sq ft need a building permit. Any digging needs a JULIE request 3 to 10 days ahead.
4. Forms, base and steel
The crew digs out, compacts the stone base, sets and stakes the forms, and places rebar or mesh where the job calls for it. Footings go 42 inches below grade in Rockford and are inspected before the pour.
5. The pour and finish
The truck places the concrete, the crew screeds and floats it, puts on the finish (broom, smooth, stamped or exposed aggregate), tools the edges and cuts the control joints.
6. Cure and first winter
The slab is kept moist while it gains strength. The Portland Cement Association wants at least 7 days of moist curing and then about 30 days of drying before new concrete sees deicers, which matters in a city with 135.8 freezing nights a year.
What helps price a concrete job
- Length and width in feet, even rough. A two-car driveway is often about 24 by 24 feet.
- Whether old concrete, asphalt or pavers come out first, and how thick the old slab is.
- The finish you want: plain broom finish, smooth, stamped or exposed aggregate.
- What sits on it: cars, a camper, a pole barn full of equipment, or foot traffic only.
- Whether the work touches the street or the public sidewalk, which brings in the town's right-of-way permit.
- Access for the truck, or whether concrete has to be wheeled or pumped to the back yard.
Before the pour
- Mark sprinkler lines, invisible dog fences and private electric runs; JULIE marks utility lines only.
- Move cars and anything stored on the old slab.
- Ask where the control joints go and how the slab drains. See the crack and joint guide.
After the pour
- Keep traffic off until the crew says it is ready. The curing guide has the timing.
- Skip rock salt on new concrete its first winter and never use ammonium-based deicers (salt guide).
- Keep the permit and inspection paperwork with the house records; buyers ask.
- Get any warranty terms in writing.
Every typical price is on the concrete cost page.
Sources: City of Rockford, 2026 driveway, curb cut, sidewalk and approach permit application; City of Rockford, building permits; City of Rockford, building permit FAQ (frost depth, exemptions); JULIE (Illinois One-Call), when to call; Illinois Home Repair and Remodeling Act, 815 ILCS 513/15; Portland Cement Association, Design and Control of Concrete Mixtures (EB001); National Weather Service, Rockford 1991-2020 normals
Start with step one
The town, the job and a rough size. That is all the form needs.
Prices and the full service list are on the homepage for a concrete contractor in Rockford.
